Figure 13. Water Tank Installation.
Figure 17. Water Tank Installation.

Field Maintenance Manual Tools List For Engineer Mission Module - Water Distributor Page Navigation
  1059    1060    1061    1062    1063  1064  1065    1066    1067    1068    1069  
img
.
TM 5-3825-270-23&P
0195
INSTALLATION - Continued
NOTE
Both sides of the water distributor must be lifted and supported to install spring mount studs.
Water distributor should only be raised and supported one side at a time. Left side shown.
7.
Using air lifting bag , lift and support flatrack (Figure 15, Item 1) on wood blocks.
1
WOOD
BLOCKS
AIR LIFTING
BAG
WOOD BLOCKS
Figure 15. Water Tank Installation.
8.
Install 12 studs (Figure 16, Item 5), springs (Figure 16, Item 4), washers (Figure 16, Item 3), and 24 locknuts
(Figure 16, Item 2) on mounting plates (Figure 16, Item 6) and flatrack (Figure 16, Item 1).
2
3
4, 5
1
6
Figure 16. Water Tank Installation.
9.
Using air lifting bag, lift flatrack (Figure 17, Item 1) and remove wood blocks.
0195-10