• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS) - Continued
Table 1. FIELD LEVEL PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS) - Continued

Field Maintenance Manual Tools List For Engineer Mission Module - Water Distributor Page Navigation
  392    393    394    395    396  397  398    399    400    401    402  
img
. .
TM 5-3825-270-23&P
0069
FIELD MAINTENANCE
FIELD LEVEL PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS)
INITIAL SETUP:
Not Applicable
Table 1. FIELD LEVEL PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS)
EQUIPMENT NOT
ITEM TO BE CHECKED
READY/
ITEM
INTERVAL
OR SERVICED
PROCEDURE
AVAILABLE IF:
NO.
WARNING
BATTERIES
To avoid shock when
disconnecting the batteries,
ensure that the negative
terminal is disconnected first
and the system power is
turned off. Failure to comply
may result in serious injury
or death to personnel and/or
damage to equipment.
1
50 Hours/
Batteries
Remove battery box cover (TM
Batteries have
Semi-
5-3825-270-10). Clean and inspect
damage that will
Annual
tops of both batteries for obvious
impair opera-
signs of damage.
tion.
0069-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.