• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 2. Radiator Fill Cap
HYDRAULIC OIL RESERVOIR SERVICING - WATER WELL DRILLING RIG (WWDR) AND WATER WELL SUPPORT VEHICLE (WWSV)

Technical Manual For Water Well Drilling System (Wwds) - 2 Page Navigation
  649    650    651    652    653  654  655    656    657    658    659  
img
.
TM 5-3820-276-10-2
0218
FILLING OVERFLOW RESERVOIR
1.
Clean area around coolant overflow reservoir fill cap (Figure 3, Item 2) with cleaning cloth.
1
2
3
WWDS00708
Figure 3.
Coolant Overflow Fill Cap.
2.
Remove coolant overflow reservoir fill cap (Figure 3, Item 2) from coolant overflow reservoir
(Figure 3, Item 1).
3.
Add coolant to overflow reservoir (Figure 3, Item 1) until coolant level is at center of sight gauge
(Figure 3, Item 3).
4.
Install coolant overflow reservoir fill cap (Figure 3, Item 2) to coolant overflow reservoir (Figure 3, Item 1).
5.
Clean any spillage from around coolant overflow reservoir fill cap (Figure 3, Item 2) with cleaning cloth.
6.
Raise WWSV rear work platform and step (Volume 1, WP 0048).
7.
Close WWDR catwalks, as required (Volume 1, WP 0029).
END OF TASK
END OF WORK PACKAGE
0218-4
02/13/2013root(gen.maintwp)wpno(M00004)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.