TM 5-3820-276-10-2
0199
Table 5.
PMCS - WWSV - During Drilling Operation - Continued.
ITEM TO BE
EQUIPMENT
ITEM
CHECKED OR
NOT READY/
NO.
INTERVAL
SERVICED
PROCEDURE
AVAILABLE IF:
1
1
WWDS00775
Figure 35. Water Transfer Pump.
2
During
Hydraulic Oil
Check hydraulic oil tank sight gauge for proper oil level Hydraulic oil tank level
Tank Sight
and temperature.
low. Add hydraulic oil as
Gauge
notify maintenance.
Hydraulic oil temperature
is greater than 180F
(82C). Notify
maintenance.
3
During
Hoses
Check all hoses for leaks and damage.
Hoses leaking or
damaged. Notify
maintenance.
4
During
Water tank
Check water level gage for proper water level.
Water tank empty or
water level low . Add
water as required
(Volume 1, WP 0036)
Mandatory Replacement Parts
There are no mandatory replacement parts required for this PMCS procedure.
END OF TASK
END OF WORK PACKAGE
02/13/2013root(pmcswp)wpno(I20001)