• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 33. Front of Cab.
Figure 35. Water Transfer Pump.

Technical Manual For Water Well Drilling System (Wwds) - 2 Page Navigation
  415    416    417    418    419  420  421    422    423    424    425  
img
.
TM 5-3820-276-10-2
0199
Table 4.
PMCS - WWSV - Before Drilling Operation - Continued.
ITEM TO BE
EQUIPMENT
ITEM
CHECKED OR
NOT READY/
NO.
INTERVAL
SERVICED
PROCEDURE
AVAILABLE IF:
1
1
WWDS00775
Figure 34. Water Transfer Pump.
2
Before
Water tank
Check water level gage for proper water level.
Water tank empty or
water level low . Add
water as required
(Volume 1, WP 0036)
Table 5.
PMCS - WWSV - During Drilling Operation.
ITEM TO BE
EQUIPMENT
ITEM
CHECKED OR
NOT READY/
NO.
INTERVAL
SERVICED
PROCEDURE
AVAILABLE IF:
1
During
Water Transfer
Apply grease, as required, to four water transfer pump
Pump
grease fittings (Figure 35, Item 1), after every 4 hours
Lubrication
of continuous operation.
0199-31
02/13/2013root(pmcswp)wpno(I20001)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.