TM 5-3820-276-10-2
0200
Table 1.
PMCS - MCS - Before Road and Towing Operation - Continued.
ITEM TO BE
EQUIPMENT
ITEM
CHECKED OR
NOT READY/
NO.
INTERVAL
SERVICED
PROCEDURE
AVAILABLE IF:
NOTE
7
Before
Leveling Jacks
MCS has four manual leveling
jacks, one located on each corner
of trailer frame.
operate the same, left front shown.
security.
damaged or not secure.
Notify maintenance.
1
WWDS00570
Figure 6.
Leveling Jacks.
8
Before
Left-Side Wheels 1. Check tires (Figure 7, Item 1) for cuts, gouges, and
Tire cut, gouged, or
and Tires
uneven wear. Replace wheel and tire assembly as
shows uneven wear.