TM 5-3820-276-10-2
0200
Table 1.
PMCS - MCS - Before Road and Towing Operation - Continued.
ITEM TO BE
EQUIPMENT
ITEM
CHECKED OR
NOT READY/
NO.
INTERVAL
SERVICED
PROCEDURE
AVAILABLE IF:
NOTE
7
Before
Leveling Jacks
MCS has four manual leveling
jacks, one located on each corner
of trailer frame.
All four manual leveling jacks
operate the same, left front shown.
Check leveling jacks (Figure 6, Item 1) for damage and Manual leveling jacks
security.
damaged or not secure.
Notify maintenance.
1
WWDS00570
Figure 6.
Leveling Jacks.
8
Before
Left-Side Wheels 1. Check tires (Figure 7, Item 1) for cuts, gouges, and
Tire cut, gouged, or
and Tires
uneven wear. Replace wheel and tire assembly as
shows uneven wear.
required (WP 0207).