Table 1. PMCS - WWDR - Before Road and Towing Operation - Continued
Table 1. PMCS - WWDR - Before Road and Towing Operation - Continued

Technical Manual For Water Well Drilling System (Wwds) - 2 Page Navigation
  351    352    353    354    355  356  357    358    359    360    361  
img
.
TM 5-3820-276-10-2
0198
Table 1.
PMCS - WWDR - Before Road and Towing Operation - Continued.
ITEM TO BE
EQUIPMENT
ITEM
CHECKED OR
NOT READY/
NO.
INTERVAL
SERVICED
PROCEDURE
AVAILABLE IF:
1
3
2
5
9
8
7
6
4
WWDS00546
Figure 8.
Transfer Case.
2. Check transfer case low lube pressure sensor
Transfer case low lube
(Figure 8, Item 4) for leaks, damage, or broken wires or pressure sensor leaking,
connector.
or has broken wires or
connector. Notify
maintenance.
WARNING
20
Before
Fuel Tank
Fuel is highly flammable and can be
accidently ignited. Do not allow fuel to come
in contact with hot surfaces, such as
exhaust manifold, pipe, or muffler. Do not
smoke or allow open flame or sparks in the
vicinity while working on any part of fuel
system. Failure to comply may result in
injury or death to personnel. Seek medical
attention in the event of an injury.
Check fuel tank (Figure 8, Item 9) for damage, leaks,
Fuel tank damaged,
or missing cap.
leaking, or missing cap.
Notify maintenance.
21
Before
Right-Side Front
Check front downrigger (Figure 8, Item 8) for leaks,
Downrigger leaking,
Downrigger
cracks in welds, or missing hardware.
cracked, or missing
hardware. Notify
maintenance.
0198-9