• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Table 1. PMCS - WWDR - Before Road and Towing Operation - Continued
Table 1. PMCS - WWDR - Before Road and Towing Operation - Continued

Technical Manual For Water Well Drilling System (Wwds) - 2 Page Navigation
  348    349    350    351    352  353  354    355    356    357    358  
img
.
TM 5-3820-276-10-2
0198
Table 1.
PMCS - WWDR - Before Road and Towing Operation - Continued.
ITEM TO BE
EQUIPMENT
ITEM
CHECKED OR
NOT READY/
NO.
INTERVAL
SERVICED
PROCEDURE
AVAILABLE IF:
WARNING
8
Before
Fuel Tank
Fuel is highly flammable and can be
accidently ignited. Do not allow fuel to come
in contact with hot surfaces, such as
exhaust manifold, pipe, or muffler. Do not
smoke or allow open flame or sparks in the
vicinity while working on any part of fuel
system. Failure to comply may result in
injury or death to personnel. Seek medical
attention in the event of an injury.
Check fuel tank (Figure 5, Item 4) for damage, leaks,
Fuel tank damaged,
or missing cap.
leaking, or missing cap.
Notify maintenance.
1
5
4
3
2
WWDS00543
Figure 5.
WWDR Left-Side.
9
Before
Left-Side
Check all hoses and lines underneath entire length of
Any fuel, Class III leak, or
Exterior
left-side of WWDR (Figure 5, Item 1) for fluid and air
air lines/fittings leaking,
leaks, damage, and missing hardware.
damaged, or missing
hardware. Notify
maintenance.
10
Before
Drive Shafts
Check drive shafts for security, damage, and missing
Drive shafts loose,
hardware.
damaged, or missing
hardware. Notify
maintenance.
0198-6
02/13/2013root(pmcswp)wpno(I10001)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.