• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Table 1. PMCS - WWDR - Before Road and Towing Operation - Continued
Table 1. PMCS - WWDR - Before Road and Towing Operation - Continued

Technical Manual For Water Well Drilling System (Wwds) - 2 Page Navigation
  347    348    349    350    351  352  353    354    355    356    357  
img
.
TM 5-3820-276-10-2
0198
Table 1.
PMCS - WWDR - Before Road and Towing Operation - Continued.
ITEM TO BE
EQUIPMENT
ITEM
CHECKED OR
NOT READY/
NO.
INTERVAL
SERVICED
PROCEDURE
AVAILABLE IF:
2
3
4
5
1
6
6
6
6
7
WWDS00542
Figure 4.
Valves and Circuit Breakers.
6
Before
Slave
Check slave receptacle (Figure 4, Item 7) for damage
Slave receptacle
Receptacle
or broken wires.
damaged or wires broken.
Notify maintenance.
7
Before
Circuit Breakers
1. Check circuit breakers (Figure 4, Items 2 and 4) for
Circuit breaker broken.
damage.
Notify maintenance.
2. Check circuit breaker ON/OFF levers (Figure 4,
Circuit breaker levers
Items 3 and 5) for damage.
loose, broken, or will not
tun on or off. Notify
maintenance.
Ensure circuit breaker
levers are set to ON
position.
3. Check electrical cables (Figure 4, Item 6) for security Cables loose or
and damage.
damaged. Notify
maintenance.
0198-5
02/13/2013root(pmcswp)wpno(I10001)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.