• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 12. Crank Handle to Bracket Installation.
Figure 2. WWDR Air Standpipe

Technical Manual For Water Well Drilling System (Wwds) - 1 Page Navigation
  603    604    605    606    607  608  609    610    611    612    613  
img
. . . . . .
TM 5-3820-276-10-1
0058
OPERATOR MAINTENANCE
SETUP PROCEDURES - PORTABLE AIR COMPRESSOR (PAC)
INITIAL SETUP:
Personnel Required
References
Two
WP 0015
WP 0057
PAC SETUP
NOTE
Position PAC on ground as stable and level as possible.
Make sure drill operator has a clear view of PAC operator.
See Figure 1 for a general diagram of a typical drill site set up. Drill operator will
determine best position for setting up equipment for each specific drill site.
1.
Position PAC in a location where ground is as stable and level as possible (Figure 1).
C
C
PORTABLE
O
O
N
N
AIR
E
E
COMPRESSOR
X
X
(PAC)
WATER
WELL
DRILLING
RIG
WATER
(WWDR)
WELL
MUD
SUPPORT
CLEANING
VEHICLE
SYSTEM
(WWSV)
(MCS)
WWDS00225
Figure 1.
PAC Setup Location (Typical).
2.
Install wheel chocks (WP 0015).
3.
With aid of an assistant, disconnect PAC from tow vehicle (WP 0057).
0058-1
02/13/2013root(opusualwp)wpno(O30008)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.