• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
POST DOWNRIGGER PROCEDURES
Figure 3. Handrail Closeout

Technical Manual For Water Well Drilling System (Wwds) - 1 Page Navigation
  520    521    522    523    524  525  526    527    528    529    530  
img
.
TM 5-3820-276-10-1
0048
POST DOWNRIGGER PROCEDURES - Continued
1
2
3
4
WWDS00266
Figure 2.
Downrigger Controls.
2.
Push FRONT RIGHT DOWNRIGGER (Figure 2, Item 3) lever and FRONT LEFT DOWNRIGGER
(Figure 2, Item 1) lever to UP position until downriggers have raised completely.
END OF TASK
0048-3
02/13/2013root(opusualwp)wpno(O20009)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.