• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
POST OPERATION PROCEDURES - WATER WELL SUPPORT VEHICLE (WWSV)
Figure 2. Downrigger Controls

Technical Manual For Water Well Drilling System (Wwds) - 1 Page Navigation
  519    520    521    522    523  524  525    526    527    528    529  
img
TM 5-3820-276-10-1
0048
POST EMERGENCY LADDER PROCEDURES - Continued
3.
Install safety pin (Figure 1, Item 2) to pin (Figure 1, Item 1).
4.
Install pin (Figure 1, Item 9) to bracket (Figure 1, Item 8).
5.
Install safety pin (Figure 1, Item 7) to pin (Figure 1, Item 9).
6.
Install pin (Figure 1, Item 4) to bracket (Figure 1, Item 5).
7.
Install safety pin (Figure 1, Item 6) to pin (Figure 1, Item 4).
END OF TASK
POST DOWNRIGGER PROCEDURES
WARNING
Always stay clear of the downriggers during operation. Failure to comply may result in
injury or death to personnel. Seek medical attention in the event of an injury.
NOTE
Downrigger control levers must be held in position to operate and are spring
loaded to the neutral position.
Downrigger controls should be operated in pairs. Both front controls and both rear
controls should be operated together.
1.
Push REAR RIGHT DOWNRIGGER (Figure 2, Item 4) lever and REAR LEFT DOWNRIGGER
(Figure 2, Item 2) lever to UP position until downriggers have raised completely.
0048-2
02/13/2013root(opusualwp)wpno(O20009)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.