TM 5-3820-276-10-1
OPERATOR MAINTENANCE
SETUP PROCEDURES - GROUTER
INITIAL SETUP:
Tools and Special Tools
References
Sling, Nylon Web, 8-ft, Choker Type (Qty 2)
(Volume 2, WP 0231, Table 1, Item 58)
Sling, Nylon Web, 16 Feet Choker Type (Volume
2, WP 0231, Table 1, Item 59)
Equipment Condition
Water Well Support Vehicle (WWSV) setup
Personnel Required
Two
GROUTER REMOVAL FROM WWSV
WARNING
Check the inspection date of all lifting devices. Never use lifting device that has an expired
inspection date. Failure to comply may result in injury or death to personnel. Seek medical
attention in the event of an injury.
1.
Install two lifting straps (Figure 1, Item 2) to two grouter lifting rings (Figure 1, Item 3) and crane hook
(Figure 1, Item 1).
1
2
3
WWDS00391
Figure 1.
Lifting Strap Installation.