TRUCK MOUNTED CRANE OPERATING PROCEDURE - Continued
Figure 3. Truck Mounted Crane Remote Control Operation

Technical Manual For Water Well Drilling System (Wwds) - 1 Page Navigation
  423    424    425    426    427  428  429    430    431    432    433  
img
.
TM 5-3820-276-10-1
0034
TRUCK MOUNTED CRANE OPERATING PROCEDURE - Continued
result in injury or death to personnel. Seek medical attention in the event of an
injury.
Never operate the crane with less than three wraps of cable on the winch drum to
prevent excessive load on the cable anchor clamp and to avoid a potential safety
hazard. Failure to comply may result in injury or death to personnel. Seek medical
attention in the event of an injury.
CAUTION
Ensure to follow load capacity chart for boom extension and degree of lift. Failure to
comply may result in damage to equipment.
7.
Turn ELECTRIC POWER CRANE lever (Figure 2, Item 1) to ON position.
1
WWDS00148
Figure 2.
Truck Mounted Crane Power Switch (On).
8.
Remove truck mounted crane radio remote control (Figure 3, Item 3) from storage.