• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 6. Jib Controls
Figure 8. Lifting Beam

Technical Manual For Water Well Drilling System (Wwds) - 1 Page Navigation
  378    379    380    381    382  383  384    385    386    387    388  
img
.
TM 5-3820-276-10-1
0030
ROD HANDLING ARM SUPPORT BRACKET INSTALLATION
1.
Set and hold PIPE POSITIONING ARM ELEVATION switch (Figure 7, Item 1) to RAISE position until
automated rod handling arm (Figure 7, Item 2) is in upright position.
1
2
WWDS01014
Figure 7.
Pipe Positioning Arm.
0030-8
02/13/2013root(opusualwp)wpno(O10017)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.