• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
ROD HANDLING ARM SUPPORT BRACKET (TRANSPORT MODE ONLY)
Figure 2. Jib Controls

Technical Manual For Water Well Drilling System (Wwds) - 1 Page Navigation
  372    373    374    375    376  377  378    379    380    381    382  
img
.
TM 5-3820-276-10-1
0030
ROD HANDLING ARM SUPPORT BRACKET REMOVAL - Continued
3
1
2
3
4
8
5
7
6
WWDS00818
Figure 1.
Drill Rod Handling Arm.
2.
Set and hold PIPE POSITIONING ARM ELEVATION switch (Figure 1, Item 8) to RAISE position until
automated rod handling arm (Figure 1, Item 3) is in full upright position.
3.
With aid of an assistant, set LIFTING BEAM switch (Figure 1, Item 2) to UP position and raise lifting beam
(Figure 1, Item 6) until it makes contact with support beam.
4.
Push JIB ROTATE/RAISE/LOWER lever (Figure 2, Item 1) up to raise jib arm (Figure 2, Item 2), as
required.
0030-2
02/13/2013root(opusualwp)wpno(O10017)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.