TM 5-3820-276-10-1
0024
MANUAL STORING OF DRILL ROD - Continued
NOTE
Ensure transfer to storage position is clear and lifting beam is in a position low enough to
allow arm to fully lower to its end of travel.
19.
Set and hold PIPE POSITIONING ARM ELEVATION switch (Figure 19, Item 6) down in LOWER position to
lower automated rod handling arm (Figure 19, Item 3) and drill rod (Figure 19, Item 5).
1
2
3
4
5
7
6
WWDS00899
Figure 19. Automated Rod Handling Arm in Down Position.
20.
Set and hold LIFTING BEAM switch (Figure 19, Item 2) in UP position to move lifting beam
(Figure 19, Item 4) up until it comes in contact with drill rod (Figure 19, Item 5).
21.
Push and hold PIPE CLAMP RELEASE ENABLE button (Figure 19, Item 1) and PIPE POSITIONING ARM
CLAMP switch (Figure 19, Item 7) in down position to release drill rod (Figure 19, Item 5).
02/13/2013root(opusualwp)wpno(O10010)