• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 9. Left-Side Work Platform
Figure 11. Console Cover Panel Removal.

Technical Manual For Water Well Drilling System (Wwds) - 1 Page Navigation
  163    164    165    166    167  168  169    170    171    172    173  
img
.
TM 5-3820-276-10-1
0017
REAR WORK PLATFORMS SETUP - Continued
5.
Remove two safety pins (Figure 10, Item 3) from pins (Figure 10, Item 1).
1
3
2
WWDS00228
Figure 10. Right-Side Work Platform.
6.
With aid of an assistant, remove two pins (Figure 10, Item 1) from right-side work platform
(Figure 10, Item 2).
7.
With aid of an assistant, lower right-side work platform (Figure 10, Item 2).
8.
Install two pins (Figure 10, Item 1) and safety pins (Figure 10, Item 3) back into pin holes.
END OF TASK
0017-11
02/13/2013root(opusualwp)wpno(O10004)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.