TM 5-3820-276-10-1
0017
LOWERING JACKS (DOWNRIGGERS) - Continued
6.
Lift two front JACK LF and JACK RF switches (Figure 12, Item 6) to lower two forward downriggers
(Figure 12, Item 8) until downriggers contact ground.
7.
Lower downriggers (Figure 12, Items 7 and 8) until bubble levels (Figure 12, Item 4) show WWDR is level
from front to back and side to side.
END OF TASK
0017-14
02/13/2013root(opusualwp)wpno(O10004)