TM 10-4930-204-13
S E C T I O N I I I .
GENERAL MAINTENANCE
5-6.
GENERAL.
Refer to Chapters 3 and 4 for operator
preventive maintenance checks and services.
Ensure drainage of pump, manifold
and organizational
assembly and
hoses to preclude fuel spills during maintenance.
5-7.
GENERAL DISASSEMBLY PROCEDURES.
a.
Components to be repaired shall be disassembled to the extent
required for complete serviceability.
b.
Serviceable, precision matched or mated parts shall be mark-
ed, handled and stored to preclude damage and to ensure reassembly and
installation in their matched and mated positions in the same assembly
or component.
5-8.
GENERAL REPAIR AND/OR REPLACEMENT CRITERIA.
a.
In-process inspection shall be performed on each assembly,
subassembly and component parts being repaired to ensure strict
adherence to criteria established by this manual.
b.
Welding shall assure complete fusion and penetration and be
in compliance with current specifications and standards.
5-9.
GENERAL REASSEMBLY PROCEDURES.
a.
General precautions shall be adhered to during reassembly to
ensure that all internal parts have been properly installed and
necessary tolerance checks performed.
b.
Upon completion of reassembly, unit shall be lubricated in
accordance with Lubrication Order.
S E C T I O N I V,
REPAIR OF PUMPING ASSEMBLY
5-10.
GENERAL.
This section provides maintenance instructions for the components
of the pumping assembly, to include engine and electrical motor
components, which are applicable to direct support maintenance.
5-11 l
MAGNETO.
a.
Removal.
Remove the magneto (para 4-24f.).
5-2
