TM 10-4930-204-13S E C T I O N I I I .GENERAL MAINTENANCE5-6.GENERAL.Refer to Chapters 3 and 4 for operatorpreventive maintenance checks and services.Ensure drainage of pump, manifoldand organizationalassembly andhoses to preclude fuel spills during maintenance.5-7.GENERAL DISASSEMBLY PROCEDURES.a.Components to be repaired shall be disassembled to the extentrequired for complete serviceability.b.Serviceable, precision matched or mated parts shall be mark-ed, handled and stored to preclude damage and to ensure reassembly andinstallation in their matched and mated positions in the same assemblyor component.5-8.GENERAL REPAIR AND/OR REPLACEMENT CRITERIA.a.In-process inspection shall be performed on each assembly,subassembly and component parts being repaired to ensure strictadherence to criteria established by this manual.b.Welding shall assure complete fusion and penetration and bein compliance with current specifications and standards.5-9.GENERAL REASSEMBLY PROCEDURES.a.General precautions shall be adhered to during reassembly toensure that all internal parts have been properly installed andnecessary tolerance checks performed.b.Upon completion of reassembly, unit shall be lubricated inaccordance with Lubrication Order.S E C T I O N I V,REPAIR OF PUMPING ASSEMBLY5-10.GENERAL.This section provides maintenance instructions for the componentsof the pumping assembly, to include engine and electrical motorcomponents, which are applicable to direct support maintenance.5-11 lMAGNETO.a.Removal.Remove the magneto (para 4-24f.).5-2
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business