TM 10-4320-318-14Section III. OPERATION UNDER USUAL CONDITIONS2-6. Assembly and Preparation for Use. Refer to system manual for site requirements.a.PumpUnitSetup. Perform the following:(1)(2)(3)(4)Remove the plastic caps from suction and discharge lines.Retain caps for preparation formovement.NOTEThe anti-seizing tape is to be wrapped in the same direction as the pipethreads.Apply anti-seizing tape (Item 11, Appendix E) to pipe threads of pipe nipples. Install pipe nipplesto pump suction and discharge ports.Install quick-disconnect coupling halves to pipe nipples. Refer to system manual.WARNINGDO NOT operate engine around open fuel. Fuel presents an extreme explosion and firehazard. Make sure fuel lines are securely connected and free of leaks. Never refuel ahot or running engine. Avoid overfilling fuel tank. Always use correct fuel type.CAUTIONDO NOT operate pump unless casing is filled to top of suction port. Operating a drypump will cause overheating and damage to pump unit.Remove priming plug (1, Figure 2-2) and fill pump casing with water to the top of the suction port(2).Figure 2-2. Primary Plug2-7
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business