TM 10-4320-318-14b.PreparingPumpUnitforOperation. Connect pump suction and discharge lines in accordance withsystem manual.2-7. Initial Adjustments and Daily Checks. Perform the following:a.Open noise enclosure access doors.b.Perform before (B) PMCS.c.Close noise enclosure access doors.2-8. Operating Procedures.a.Pump Unit Startup. Perform the following:(1)(2)(3)(4)(5)(6)Open side door of noise enclosure.Put speed control lever in START position (1, Figure 2-3).Pull extra fuel button.Put decompression lever in position 2.in cold climates, use oil priming device for starting per paragraph 2-12.Remove starting handle from stowed position (2).Figure 2-3. Pump Unit Startup2-8
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business