TM 10-4320-318-14
b.
Preparing Pump Unit for Operation. Connect pump suction and discharge lines in accordance with
system manual.
2-7. Initial Adjustments and Daily Checks. Perform the following:
a.
Open noise enclosure access doors.
b.
Perform before (B) PMCS.
c.
Close noise enclosure access doors.
2-8. Operating Procedures.
a.
Pump Unit Startup. Perform the following:
(1)
(2)
(3)
(4)
(5)
(6)
Open side door of noise enclosure.
Put speed control lever in START position (1, Figure 2-3).
Pull extra fuel button.
Put decompression lever in position 2.
in cold climates, use oil priming device for starting per paragraph 2-12.
Remove starting handle from stowed position (2).
Figure 2-3. Pump Unit Startup
2-8