c. Cleaning and Inspection.
(1) Clean and dry all parts thoroughly.
(2) Inspect the spring housings for broken
welds, dents, distortion, and other damage.
(3) Inspect the reels for leakage, distortion,
dents, defective ratchet, and other damage.
( 4 ) R e p l a c e a d e f e c t i v e r e e l a n d s p r i n g
housing.
d. Installation.
(1) Refer to figure 4-22 and install the hose
r e e l s a n d s p r i n g h o u s i n g s i n r e v e r s e o r d e r of
removal.
(2) Install the discharge hoses and nozzles
(para 4-33).
4-35. Nozzle Assembly
a. Removal. Refer to figure 4-21 and remove
nozzles.
b.
tube
(29).
Disassembly.
(1) Pull dustcap (9, fig. 4-23) from end of
assembly (13).
(2)
Unscrew
tube
assembly
(13)
from
body
(3) Unscrew and remove cap (1) from body
(29).
(4) Remove spring (2) from the body.
(5) Remove upper poppet (3) from body.
(6) Remove the disc holder (4), disc (5), and
washer disc (6).
(7) Remove nut (7) and stem (8) from the
body.
(8) Remove lever (18) by removing the cotter
pin (16) and pin (17).
(9) Unscrew and remove the packing nut (19).
(10) Remove packing (21) from the body.
4-33
