INTERVALITEMNO.ITEM TO BE INSPECTEDPROCEDUREEquipment isNot Ready/AvailableTM 5-4320-306-10Table 2-2. Preventive Maintenance Checks and Services ContinuedB - Before OperationA - After OperationD - During OperationW - WeeklyBDAW10Discharge Manifold Assembly.There is evidence of Class III leaks.Inspect the discharge manifold for leaks at flanges(1), air cover gasket (2), hoses (3), valves (4),discharge gage tap (5), hose (6), and victaulichoseline connection (7).11Pump Assembly.Pump assembly orbearing housingCheck that pump assembly (1) is securely mountedmounting hardwareto skid (2) and engine flywheel housing (3).is loose or broken.There is evidence ofCheck that pump body (4) and bearing housing (5) Class III leaks orare securely fastened together.there are cracks.Check that all nuts and lockwashers (6) are tightand free of damage and corrosion.Check that plugs (7) are securely installed in thepump body. Check pump body (4) for cracks atmounting feet (8), suction and discharge flanges(9 and 10), priming check valve port (11), andbearing housing mounting bolts (12).2-22
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business