TM 5-4320-300-14CAUTIONDo not overfill. Oil may be blown out through the crankcase breather if crankcase is overfilled.Remove oil filler cap and add oil as required. See LO 5-4320-300-12 (figure 4-1). Replace oil filler cap.2-5.OPERATING PROCEDUREa.Setup Instructions. Proper selection of an operating site is important for efficient and trouble-free pumpoperation. Since the pump unit is self contained, it can be moved to the most favorable operating site. Select operatingsite with the following characteristics:(1)Locate unit as close as possible to the water to be pumped. Keep the suction hose and the amount of lift as short as possible.(2)The operating site should be as level as possible (no more than 15 degrees slope) or the engine lubricationsystem may not work properly.(3)Keep the suction and discharge hoses as short and straight as possible.(4)Allow adequate space to permit support of the suction and discharge hoses where they enter the pump.b.Securing Trailer at Site.WARNINGLower and pin the rear stands before disconnecting centrifugal pump unit from towing vehicle.Unit could drop on rear bumper and cause personal injury.CAUTIONRemove and insert pin from rear stand assemblies with the handle end of the pin facing upward.The pin locking mechanism will stick within the rear stand if pin is inserted and removed any otherway.2-54
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business