TM 5-4320-300-14
Table 2-2. Operator/Crew Preventive Maintenance Checks and Services - Continued
B -
Before Operation
A -
After Operation
M - Monthly
D -
During Operation
W -
Weekly
INTERVAL
ITEM TO BE INSPECTED
ITEM
IS NOT READY/
NO. B D A W M
PROCEDURE
AVAILABLE IF
7
Starting Aid Atomizer Tubing. Remove engine side panels.
Unfasten hasps and catch assemblies, then pull side
panels up and out to remove.
Inspect atomizer and atomizer tubing for visible
damage.
Replace engine side panels.
2-16