check alignment of the retainer (18) on the
(3)
Remove the shaft (50) from the frame.
retaining ring (17).
Press the bearing races (48) from the shaft.
.
(4) Press the bearing (46) and seal (51) from
109.1. Generator Regulator Repair
the frame.
c. Cleaning and Inspection.
b
(1) Clean the housing (5 gasket (6), preformed
),
b.
Disassembly
.
Disassemble the generator
packing (8), and distributor block with a wet,
regulator in the order of the index numbers assigned to
soapy cloth. Rinse and wipe dry.
(2) Clean all metal parts except bearings in an
c. Cleaning and Inspection.
approved cleaning solvent; dry with clean,
dry compressed air.
(1) Clean all electrical parts with a cloth lightly
(3) Clean, inspect, and lubricate bearings as
dampened in an approved cleaning
solvent.
(4) Clean the electrical parts with a cloth
(2)
Clean all other parts in an approved
dampened in an approved cleaning solvent.
cleaning solvent; dry thoroughly.
(5) Inspect the electrical parts for corrosion,
(3)
Inspect all parts for serviceability and
cracks, breaks, frayed insulation, damaged
damage; replace unserviceable parts.
terminals, or evidence of failure. Replace if
d. Assembly Assemble the generator regulator in
.
damaged or defective.
the reverse order of disassembly.
(6) Inspect the spring (38) for wear, cracks,
.
damage, or loss of tension; replace if
damaged or deformed.
110. Magneto Repair
(7) Inspect gear teeth for chips, breaks, wear,
or damage; replace if damaged.
a. Removal. Remove the magneto (para 70).
a
(8)
b. Disassembly
.
Disassemble the magneto in
order of the index numbers assigned to figure 54. Note
(9) Inspect all other parts for cracks, breaks,
the following special instructions:
wear, or other damage.
Replace if
(1) Pull the impulse coupling hub (39) from the
damaged.
shaft (50) with a suitable puller.
d. Assembly Assemble magneto in reverse order
.
(2) Remove the bearing support plate (44) from
of disassembly; observe following special instructions:
the frame (54). Press the bearing (46) from
(1) Press the bearings(46) and seal (51) into
the bearing support plate.
the frame (54).
(2) Press the one bearing race (48) onto the
shaft (50). Slide the shims (49) onto the
shaft, and press the second bearing race
onto the shaft against the shims.
(3) Press the bearing (46) into the bearing
support plate (44).
(4) Install the assembled shaft and bearings in
the frame. Slide the assembled bearing
support plate and bearing onto the shaft and
into position on the frame; secure with the
two screws (42) and washers (43).
(5) Press the impulsecoupling hub (39) onto
the shaft.
(6) Set contact point gap at 0.008 to 0.012 inch.
(7) Set the arrow on the stop pin plate (41)
opposite the 30 mark on the frame.
e. Installation Install the magneto (para 70
.
c).
Figure 53. Cutout relay, exploded view.
TAGO 6358-A
67