Section II. PREVENTIVE MAINTENANCE SERVICES
36. Daily Preventive Maintenance Services
35.
General
This paragraph contains an illustrated tabulated
To insure that the centrifugal pump is ready for
listing of preventive maintenance services which must
operation at all times, it must be inspected
be performed by the operator. The item numbers are
systematically, so that defects my be discovered and
listed consecutively and indicate the sequence of
corrected before they result in serious damage or
minimum requirements. Refer to figure 15 for the daily
failure.
The necessary preventive maintenance
preventive maintenance services:
services to be performed are listed and described in
37.
Quarterly Preventive Maintenance Se ices
rv
sequence of
minimum
inspection
requirements.
Defects discovered during operation of the unit shall be
a. This paragraph contains an illustrated tabulated
noted for future correction, to be made as soon as
listing of preventive maintenance services which must
operation has ceased. Stop operation immediately if a
be performed by organizational maintenance personnel
deficiency is noticed during operation. which would
at quarterly intervals. A quarterly interval is equal to 3
damage the equipment if operation were continued. All
calendar months, or 250 hours of operation. whichever
deficiencies and shortcomings will be recorded together
occurs first.
with the corrective action taken on DA Form 2404
b. The item numbers are listed consecutively and
(equipment inspection and maintenance worksheet) at
indicate the sequence of minimum requirements. Refer
the earliest possible opportunity.
to figure16 for the quarterly preventive maintenance
services.
TAGO 6358A
20