• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 12. Work Light Wire Harness Installation.
Figure 2. UPIK Wire Harness Removal.

Field Maintenance Manual Tools List For Engineer Mission Module - Water Distributor Page Navigation
  631    632    633    634    635  636  637    638    639    640    641  
img
. . . . . . . . . . .
TM 5-3825-270-23&P
0108
FIELD MAINTENANCE
UPIK WIRE HARNESS REPLACEMENT
INITIAL SETUP:
Materials/Parts (cont.)
Tools and Special Tools
Cable Ties (WP 0224, Table 1, Item 9)
Tool Kit, General Mechanic's: Automotive
Tags, Identification, White (WP 0224, Table 1, Item
(WP 0225, Table 1, Item 12)
54)
Jack, Hyd, 20 Ton Cap (WP 0225, Table 1, Item
2)
Block, Filler Wood, 3 in. Thick (WP 0225, Table 1,
Personnel Required
Item 2)
Construction Equipment Repairer 91L (2)
Tap & Die Set (Screwdriver) (WP 0225, Table 1,
Item 2)
References
Parts Manual (WP 0220) Figure 4018
Materials/Parts
Compound, Sealing, Loctite 242 (WP 0224, Table
1, Item 19, 20, 21, 22)
Equipment Condition
Batteries disconnected. (WP 0085)
Water tank drained. (TM 5382527010)
Hoses unstowed. (TM 5-3825-270-10)
Floating strainer unstowed. (TM 5-3825-270-10)
REMOVAL
1.
Open control panel cover (Figure 1, Item 2) by releasing rubber t-handle (Figure 1, Item 1).
1
2
Figure 1. UPIK Wire Harness Removal.
CAUTION
Do not allow control panel to hang by wires. Failure to comply may result in damage to
equipment.
2.
Remove six screws (Figure 2, Item 3) and washers (Figure 2, Item 4) from main control box (Figure 2, Item 5)
and control panel (Figure 2, Item 6).
0108-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.