• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 5. Cab Control Box Left Water Sprinkler Switch - Step 4.
Figure 7. UPIK Harness Connector Pin M - Step 5.

Field Maintenance Manual Tools List For Engineer Mission Module - Water Distributor Page Navigation
  356    357    358    359    360  361  362    363    364    365    366  
img
. .
TM 5-3825-270-23&P
0063
DECISION
No - Go to step 5. (Step 5 - Are less than 200 ohms measured at UPIK harness connector pin M to known good
ground?)
Yes - Replace cab control box LEFT WATER SPRINKLER switch. (WP 0209) Verify problem is solved. (Step 6
- Does cab control box LEFT WATER SPRINKLER switch operate?)
STEP 5
Are less than 200 ohms measured at UPIK harness connector pin M to known good ground?
1.
Disconnect water distributor UPIK electrical harness from prime mover.
UPIK AIR
CONNECTION
UPIK
ELECTRICAL
CONNECTION
Figure 6. UPIK Electrical Connection - Step 5.
2.
Ensure multimeter is set to measure continuity.
WARNING
Ensure electrical power is off prior to working on all electrical systems. Failure to comply
may result in injury or death to personnel.
Remove all jewelry, such as rings, ID tags, bracelets, etc., prior to working on or around
equipment. Jewelry and tools can catch on equipment, contact positive electrical circuits,
and cause a direct short, severe burns, or electrical shock. Failure to comply may result
in injury or death to personnel.
3.
Connect red multimeter lead to UPIK harness connector pin M.
0063-5


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.