• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 3. Cab Control Box Screws - Step 3.
Figure 6. UPIK Electrical Connection - Step 5.

Field Maintenance Manual Tools List For Engineer Mission Module - Water Distributor Page Navigation
  317    318    319    320    321  322  323    324    325    326    327  
img
. . . .
TM 5-3825-270-23&P
0058
DECISION
No - Replace red wire between LIGHTS switch and ENGINE OFF/BATTERY DRAIN indicator. (WP 0099) Verify
problem is solved. (Step 6 - Does cab control box LIGHTS switch operate?)
Yes - Go to step 4. (Step 4 - Are less than 200 ohms measured on black wire at cab control box LIGHTS switch
to known good ground?)
STEP 4
Are less than 200 ohms measured on black wire at cab control box LIGHTS switch to known good ground?
1.
Push in EMERGENCY STOP switch to off position. (TM 5-3825-270-10)
2.
Disconnect batteries. (WP 0085)
3.
Set multimeter to measure continuity.
4.
Connect red multimeter lead to black wire at cab control box LIGHTS switch.
RED WIRE
CAB CONTROL BOX
LIGHTS SWITCH
BLACK WIRE
BACK OF CAB
CONTROL BOX
Figure 5. Cab Control Box Lights Switch - Step 4.
5.
Connect black multimeter lead to known good ground.
6.
Note multimeter reading.
CONDITION/INDICATION
Are less than 200 ohms measured on black wire at cab control box LIGHTS switch to known good ground?
DECISION
No - Go to step 5. (Step 5 - Are less than 200 ohms measured at UPIK harness connector pin H to known good
ground?)
Yes - Replace cab control box LIGHTS switch. (WP 0210) Verify problem is solved. (Step 6 - Does cab control
box LIGHTS switch operate?)
STEP 5
Are less than 200 ohms measured at UPIK harness connector pin H to known good ground?
1.
Disconnect water distributor UPIK electrical harness from prime mover.
0058-4


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.