TM 5-3825-270-10
0019
PRIME FULLY DRAINED PUMP - Continued
3
4
Figure 2. Prime Fully Drained Pump.
3.
Prime water pump (Figure 3, Item 5) by pouring five to ten gal (18.9 to 37.8 L) of clean water down prime hose
(Figure 3, Item 6) or until water flows from connection point C1 (Figure 3, Item 2).