• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
PREPARATION FOR DUST CONTROL AGENT USE
Figure 2. Preparation For Dust Control Agent Use.

Technical Manual For Engineer Mission Module - Water Distributor Page Navigation
  26    27    28    29    30  31  32    33    34    35    36  
img
.
TM 5-3825-270-10
0010
PREPARATION FOR DUST CONTROL AGENT USE - Continued
1
2
4
3
Figure 1. Preparation For Dust Control Agent Use.
4.
Remove cap (Figure 1, Item 3) and attach suction hose (Figure 1, Item 2) to connection point C1 (Figure 1,
Item 1).
NOTE
Couplings are provided in the stowage box for multiple configurations of soil stabilization
additive totes.
5.
Unstow 2" coupling cam (Figure 2, Item 8), 3" coupling cam (Figure 2, Item 6) and reducer (Figure 2, Item 7)
from stowage box (Figure 2, Item 5).
0010-2


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.