• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 13. Suction Hose Removal.
IQAN DISPLAY OPERATION - Continued

Technical Manual For Water Well Drilling System (Wwds) - 1 Page Navigation
  212    213    214    215    216  217  218    219    220    221    222  
img
. . . .
TM 5-3820-276-10-1
0022
OPERATOR MAINTENANCE
IQAN DISPLAY OPERATION
INITIAL SETUP:
Equipment Condition
Engine on (WP 0012)
Water Well Drilling Rig Setup (WP 0017)
IQAN DISPLAY OPERATION
NOTE
IQAN display is used to monitor current engine conditions and automation inputs when
adding drill rods during drilling process. Screen displays command being processed at
each stage of operation. If a malfunction occurs, stage trying to complete will be displayed
on monitor. This display can assist in determining what created malfunction.
1.
To obtain engine data press UP/DOWN button (Figure 1, Item 1). The following information will be
displayed:
1
2
3
WWDS00248
Figure 1.
IQAN Display.
0022-1
02/13/2013root(opusualwp)wpno(O10015)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.