TM 10-4930-236-13&P
OPERATOR PREVENTIVE MAINTENANCE CHECKS AND SERVICES
B - Before
D - During
A - After
W - Weekly
M - Monthly
INTERVAL
PROCEDURES
EQUIPMENT IS
ITEM
ITEM TO BE
CHECK FOR AND HAVE REPAIRED
NOT READY/
NO
B
D A
W
M
INSPECTED
OR ADJUST AS NECESSARY
AVAILABLE IF:
16
*
*
*
Tank Assembly
Visual inspection to check for damage or
Evidence of
signs of leakage. Check for proper
leakage or
operation of bottom loading valve. Refer
bottom
to higher level of maintenance for repair
loading valve
or replacement of defective parts.
will not open.
17
*
*
Manhole
Check for damage and proper location
Evidence of
of manhole cover gasket, and secure
fuel leakage
manhole latches. Check the location of
exists.
vent valve under handle, close to hinge.
Refer to next higher level of maintenance
for repairs.
18
*
*
*
Coupling Half
Check for signs of leakage around the
Evidence of
valve handle shah. Check coupling
leakage.
gasket for cracks. Inspect coupling for
secure connection. Test coupling half by
observing the internal valve mechanism
as the handle is moved to ensure handle
operates valve. Refer to next higher
level of maintenance for repairs or
replacement if necessary.
19
*
*
Grounding Rod
Check for missing or damaged ground
Ground rod
rod.
missing.
2-11