TM 10-4903-236-13&P
INSTALLATION
a.
Insert gasket (12) through hole in
tank and position in place with holes alined.
b
Working through mounting hole, in
stall retainer (11).
c
Install connectors (10) and gasket
(9) on bottom loading valve (8).
d.
Lower tubes (1) through manhole to
extend far enough through mounting hole for
connection to valve (8).
e.
Install the valve (8) in tank and
fasten with flat washers (7), lockwashers (6)
and nuts (5). Torque to 50 - 55 ft.Ibs. (67.8
74.6 Nm).
f
Make certain tubes (1) are clear of
obstructions prior to connection.
g.
Connect tubes (1) at jet level sensor.
h
Check that washer (51) is on cable (2)
and insert cable through lever (3) and bushing (4).
Apply grease to bushing.
i
Refer to paragraph 4-23 to install tank
and return the tank and pump unit to operational
status.
5-23/(5-24 blank)