TM 10-4930-236-13&P
SECTION III. MAINTENANCE PROCEDURES
Paragraph
Page
5-3
Hose Reel Maintenance ...................................................................................
5-3
5-4
Centrifugal Pump and Electric Motor Maintenance ...........................................
5-7
5-5
Frame and Bracket Maintenance ......................................................................
5-11
5-6
Frame Maintenance .........................................................................................
5-13
5-7
Tank Maintenance ............................................................................................
5-16
5-8
Bosom Load Valve Maintenance.......................................................................
5-19
5-3. HOSE REEL MAINTENANCE.
This task covers:
a.
Removal
b.
Repair
c.
Assembly
INITIAL SETUP :
Tools Required
General Mechanic Tool Kit (Appendix B, Section III, Item 4)
Torque Wrench (Appendix B, Section lIl, Item 7)
Materials/Parts Required
Dry Cleaning.Solvent (Appendix E, Section II, Item 1)
Rags, Wiping (Appendix E, Section II, Item 13)
Lockwashers
Equipment Condition
Pumping Unit Removed (paragraph 4-7)
Reel Supply Hose and Dispensing Hose Removed (paragraph 4-8)
Personnel Required
Two (2)
General Safetv Instructions
WARNING
A spring loaded mechanism can cause injury.
Dry cleaning solvent is potentially dangerous to personnel and
property.
The two hose reels have recoil tension springs to wind the 40-foot discharge hoses on the reels.
NOTE
Maintenance procedures are identical for both hose reels.
REMOVAL
WARNING
A spring loaded mechanism can cause injury if released in an
uncontrolled manner. Always take care while working with a
spring loaded mechanism.
NOTE
Discard all mandatory replacement parts.
5-3
