TM 10-4930-236-13&PSECTION III. MAINTENANCE PROCEDURESParagraphPage5-3Hose Reel Maintenance ...................................................................................5-35-4Centrifugal Pump and Electric Motor Maintenance ...........................................5-75-5Frame and Bracket Maintenance ......................................................................5-115-6Frame Maintenance .........................................................................................5-135-7Tank Maintenance ............................................................................................5-165-8Bosom Load Valve Maintenance.......................................................................5-195-3. HOSE REEL MAINTENANCE.This task covers: a.Removalb.Repairc.AssemblyINITIALSETUP :ToolsRequiredGeneral Mechanic Tool Kit (Appendix B, Section III, Item 4)Torque Wrench (Appendix B, Section lIl, Item 7)Materials/PartsRequiredDry Cleaning.Solvent (Appendix E, Section II, Item 1)Rags, Wiping (Appendix E, Section II, Item 13)LockwashersEquipmentConditionPumping Unit Removed (paragraph 4-7)Reel Supply Hose and Dispensing Hose Removed (paragraph 4-8)PersonnelRequiredTwo (2)GeneralSafetvInstructionsWARNINGA spring loaded mechanism can cause injury.Dry cleaning solvent is potentially dangerous to personnel andproperty.The two hose reels have recoil tension springs to wind the 40-foot discharge hoses on the reels.NOTEMaintenance procedures are identical for both hose reels.REMOVALWARNINGA spring loaded mechanism can cause injury if released in anuncontrolled manner. Always take care while working with aspring loaded mechanism.NOTEDiscard all mandatory replacement parts.5-3
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business