TM 10-4930-236-13&P
INSTALLATION
a.
Assemble reel (23) to inner A-Frame (24).
b.
Lubricate reel hub bearing (25) surface.
c.
Assemble outer A-Frame (22) to hose reel (23) and inner A-Frame (24), and install flat washers (15, 21),
capscrews (14, 20), link (17), strap (16),iockwashers (13,19) and nuts (12,18).Torqueto 50-55ft. Ibs. (67.8-74.6 Nm).
d.
Position spring casing (6) on reel shaft and aline mounting holes.
e.
Install capscrews (4), fiat washers (5), lockwashers (3) and nuts (2). Torque to 20-23 ft.Ibs. (27.1-31.2 Nm).
f.
Position the hose guide (11) on A-Frame (24 and 22) and install capscrews (9), flat washers (10),lockwashers (8)
and nuts (7). Torque to 50-55 ft.Ibs. (67.8-74.6 Nm).
g.
Turn reel forward nine turns to load spring tension.
h.
Refer to paragraph 4-8 and install reel supply hose and dispensing hose.
5-6