TM 10-4630-207-13&P
0049 00
11
12
9
10
6
3
2
7
4
8
5
1
Figure 13. Cylinder Head Bolt Installation Sequence
12. Install rocker bracket.
a. Install the push rods (figure 14, item 1).
b. Apply liquid gasket (figure 15, item 1) to the bottom of the rocker arm bracket assembly (figure
14, item 2). Do not get any liquid gasket in the oil galley (figure 15, item 2).
c.
Install rocker arm bracket assembly (figure 14, item 2) ensuring push rods (figure 14, item 1)
align with the rocker arm. Tighten from 0.8 to 1.2 kg-m (6-9 ft-lbs).
d. Install mounting nuts (figure 14, item 3) (qty 5).
e. Torque mounting nuts from 0.8 to 1.2 kg-m (5.8 to 8.7 ft-lbs).
f.
Install mounting bolts (figure 14, item 4) (qty 4).
g. Torque mounting bolts from 0.8 to 1.2 kg-m (5.8 to 8.7 ft-lbs).
0049 00-14