TM 10-4630-206-12&P
0005 00
6. Connect appropriate hoses onto inlet ports. Ensure proper connection of the QD fittings to prevent
leakage. Support hoses with sandbags.
7. Connect a 2 -IN. discharge hose to the 2 -IN. male QD fitting on the discharge port. Support hose
with sandbags.
8. If deployed with Force Provider, connect the other end of the hose to a Force Provider wastewater
grid branch line as described in TM 10-5419-206-13. Ensure proper connection of the QD fittings to
prevent leakage. If deployed with a standalone facility, refer to the equipment TM for connection
instructions.
9. If a municipal sewage system or leach field is not available for graywater disposal, a 20,000-gallon
collapsible fabric tank may be required for graywater collection. See TM 5-5430-216-13&P.
10. Ensure no components or hardware is left in the tank. Place lid in position and secure with retainers.
11. The SEP receives power from the facility it is deployed with. Have MOS 52C or 52D qualified
personnel connect power to the SEP. Refer to equipment TM for specific instructions.
9-1-0527
9-1-0150-1 and 9-1-0150-2
0005 00-4