TM 10-4320-325-14
CHECKING UNPACKED EQUIPMENT.
a.
Inspect the equipment for damage incurred during shipment. If the equipment has been
damaged, report the damage on SF 364, Report of Discrepancy.
b.
Check the equipment against the packing slip to see if the shipment is complete. Report all
discrepancies in accordance with the instructions of DA PAM 738-750.
c.
Check to see if the equipment has been modified.
INSTALLATION INSTRUCTIONS.
Installation instructions are given in para 4-4.
PRELIMINARY SERVICING AND ADJUSTING OF EQUIPMENT.
After the centrifugal pump assembly has been assembled, set up, and transported to the operation site,
the following steps must be performed before attempting to start the engine:
a.
Fill fuel tank with diesel fuel.
b.
Make sure engine is perfectly level. Remove the dipstick cap and fill with oil according to the
ambient temperature. (Refer to LO 10-4320-325-12.)
c.
Check oil level by inserting dipstick into oil pan.
d.
Check that there are no obstructions in front of the air intake opening that might impede the
flow of cooling air.
e.
Check that there is no obstruction that might hinder pull-rope action.
Change 2