TM 10-4320-307-243-10 CASINGANDCOVERREPLACE.This task covers: a. Removal b. Cleaning/lnspection/Repair c. InstallationINITIAL SETUPToolsTool kit, general mechanic's (Item 1, Appendix B)Suitable lifting deviceMaterials/PartsSuitable blocks Crocus abrasive cloth (Item 1,Appendix C)Moldable polymer gasketing (Item 21, Appendix C)Spray solidifying agent (Item 29, Appendix C)EquipmentConditionReferenceCondition DescriptionParagraphSuction and discharge2-56assembly removedParagraphPump assembly drained2-25Paragraph Flexible coupling removed3-7ParagraphPiping and vent assembly2-26removedParagraphPump assembly removed3-8ParagraphMechanical seal and3-11bearing assembly removedGeneral Safety InstructionsWell ventilated areaInsure proper lifting methods and proceduresREMOVAL:Death or serious injury could occur if unauthorized or unnecessary personnel are in the hoistingarea. Permit only personnel actually engaged in the hoisting operation to be near the unit andhoisting equipment. All instructions for the hoisting operations must come from one authorizedperson.Injury to personnel or damage to equipment could occur from improper hoisting. Hoist the loadslowly to avoid tearing out lifting bail assembly, slipping slings, or load shift. Do not jerk theload or swing it from side-to-side when hoisting. This places additional stress on hoistingcomponents which can cause failure and loss of load. Be sure hoisting equipment is on solidfooting and is suitable for the size of the load. Watch boom angle and overhead clearance whenhoisting.3-23
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business