TM 10-4320-307-243-8 PUMP ASSEMBLY REPAIR/REPLACE (CONT).INSTALLATION:Death or serious injury could occur if unauthorized or unnecessary personnel are in the hoistingarea. Permit only personnel actually engaged in the hoisting operation to be near the unit andhoisting equipment. All instructions for the hoisting operations must come from one authorizedperson.Injury to personnel or damage to equipment could occur from improper hoisting. Hoist the loadslowly to avoid tearing out lifting bail assembly, slipping slings, or load shift. Do not jerk theload or swing it from side-to-side when hoisting. This places additional stress on hoistingcomponents which can cause failure and loss of load. Be sure hoisting equipment is on solidfooting and is suitable for the size of the load. Watch boom angle and overhead clearance whenhoisting.1. Position a suitable lifting device and slings overpump assembly (1). Attach slings around assemblyand put tension on slings. Make sure pumpassembly is properly supported.2. Lift and remove pump assembly (1) from blocks onwork platform.3. Lower pump assembly (1) carefully so that it alignswith mounting holes on skid (2). Remove liftingdevice.4. Install four bolts (3) and torque to 369 ft-lb (500 Nm)and secure pump to skid (2).5. Install piping and vent assembly in accordance withparagraph 3-9.6. Install flexible coupling in accordance with paragraph3-7.7. Fill pump assembly in accordance with paragraph 2-25.8. Install suction and discharge assembly in accordancewith paragraph 2-56.3-20
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business