TM 10-4320-307-242-61 PREPARATION FOR SHIPMENT (CONT).d.Ensure battery and storage boxes are securely closed and locked.e.Verify that grounding rods, muffler, intake duct, muffler guard, and suction and discharge nozzle adapters arestowed at their clamped and proper position on the skid assembly.CAUTIONUpon completion of these procedures, attach a red tag in the vicinity of the startingdevice with the following information:Deprocess this engine in accordance with instructions contained on DA Form 2258 orDD Form 1397 (attached to this equipment). Failure to do so could cause damage toequipment. In addition the air cleaners, fill caps, exhaust stacks, tail pipes, breathertubes, dipstick tubes, fuel cap vent holes, battery filler openings, and accessories havebeen sealed. Remove all seals prior to cranking the engine.f.Package unit as follows:NOTEFor long term outside storage or shipment of the pumping assembly, a plywood packingcontainer should be fabricated or the original container utilized.(1) Fabricate a plywood packing container if original container cannot be used.(2) Position container on pumping assembly and fasten securely.Death or serious injury could occur if unauthorized or unnecessary personnel are in thehoisting area. Permit only personnel actually engaged in the hoisting operation to benear the unit and hoisting equipment. All instructions for the hoist- ing operations mustcome from one authorized person.Injury to personnel or damage to equipment could occur from improper hoisting. Hoistthe load slowly to avoid tearing out lifting bail assembly, slipping slings, or load shift.Do not jerk the load or swing it from side-to-side when hoisting. This places additionalstress on hoisting components which can cause failure and loss of load. Be surehoisting equipment is on solid footing and is suitable for the size of the load. Watchboom angle and overhead clearance when hoisting.g.Use equipment such as a crane, forklift, or other cargo-lifting equipment to load the pump unit without anydamage. When using cables for lifting, spreader bars of adequate length must be used to prevent cables fromclosing in and crushing the pumping assembly.h.Place spreader bars and sling assembly in appropriate location inside container prior to final closure.2-237/(2-238 blank)
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business