TM 10-4320-226-142.7 PREPARATIONFORMOVEMENT.The 350 GPM Pumping Assembly can be moved either short distance around a worksiteor long distance to another location.The following paragraphs provide informationto prepare the 350 GPM Pumping Assembly for movement.2.7.1 PreparationforMovementatWorksite.Perform the following to move 350 GPM PumpingAssembly to another location at a worksite.a.If operating, perform shutdown procedures provided in paragraph 2.5.2.Figure 2-8.Disconnecting Suction and Discharge Hoses.b.Disconnect suction hose (1,figure 2-8) from coupler half (2) and connectquick disconnect plug (3) to coupler half (2).c.Disconnect discharge hose (4) from coupler half (5) and connect quickdisconnect cap (6) to coupler half (5).2-24
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business