INTERVALITEMNO.ITEM TO BE INSPECTEDPROCEDUREEquipment isNot Ready/AvailableTM 5-4320-306-10Table 2-2. Preventive Maintenance Checks and Services - ContinuedB - Before OperationA - After OperationD - During OperationW - WeeklyBDAWInjection Pump - Continued.Check that there are no leaks at banjo bolts (4) andfittings (5). Check that governor assembly (6) issecurely mounted to the pump body.Check that stop lever (7) is securely attached to theshaft of shutdown solenoid (8).Check that speed lever (9) is securely attached tothrottle extension lever (10).41Injectors.Check that injectors (1) are securely mounted.42Data and Warning Plates.Inspect that data and warning plates are securelymounted in place and all information is readable.TM 5-4320-306-102-52
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business