INTERVAL
ITEM
NO.
ITEM TO BE INSPECTED
PROCEDURE
Equipment is
Not Ready/
Available
TM 5-4320-306-10
Table 2-2. Preventive Maintenance Checks and Services - Continued
B - Before Operation
A - After Operation
D - During Operation
W - Weekly
B
D
A
W
Fuel Lines and Fittings-Continued.
Fuel pump (1) has secure and undamaged cover,
upper chamber, pump body, banjo bolts (2) and banjo
fittings.
Injector lines (3) are securely mounted.
Inspect the following fuel lines for leaks along the
length of each line for holes, cracks, worn spots, kinks
or looseness, and other damage that would cause
deterioration during operation resulting in fuel leaks or
restricted fuel flow. Check that each line is securely
mounted and during operation would be free of vibra-
tion that would cause wear or abrasion.
Fuel supply line (4)
Separator-to-pump line (5)
Pump-to-filter line (6)
Injector lines (2)
Backleakage line (7)
Overflow line (8)
Fuel return line (9)
Change 1 2-49