INTERVALITEMNO.ITEM TO BE INSPECTEDPROCEDUREEquipment isNot Ready/AvailableTM 5-4320-306-10Table 2-2. Preventive Maintenance Checks and Services - ContinuedB - Before OperationA - After OperationD - During OperationW - WeeklyBDAW29Starter Assembly (1).Evidence of arcing,overheating,Visually inspect wires for loose ring terminals (2), binding, orloose connection at starter posts (3), burn marks at cracking.connections (arcing), corrosion of ring terminals (2)or starter posts (3), damaged wire insulation (4),burned or melted insulation (4) (overheating), andfrayed or worn spiral wrap tubing (5).Visually inspect starter (6) for goose mountingscrews (7).30Air Cleaner Assembly (1).Check air cleaner restriction indicator (2). If redband appears in window, press and release resetbutton. If red band reappears, refer to Table 3-1,Troubleshooting.TM 5-4320-306-102-40
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business