TM 5-4320-302-14Section II. SERVICE UPON RECEIPT OF EQUIPMENT4-4. UNLOADING EQUIPMENTa. Before attempting to unload the Model US2520 HCCD-1 Centrifugal Pump Unit, make sure that the unloadingfacility is capable of handling 870 pounds (395 kilograms).b. Remove shipping tiedowns.Do not attempt to lift unit manually. Use crane securely fastened to lifting bracket. Do not allowunit to swing while suspended. Failure to observe this caution may result in severe damage to thepump unit.c. Unload the centrifugal pump unit by lifting with a crane secured to lifting bracket. As an alternate but lessdesirable method of unloading, the unit can be slid down a ramp on the skid assembly.4-5. INSPECTING AND SERVICING EQUIPMENTa. Inspect centrifugal pump unit for any damage that may have occurred during shipping.b. Inspect unit for loose mounting hardware.c. Inspect unit for missing components.d. Refer to figure 4-1 for lubrication instructions.e. Refer to table 4-1 and perform preventive maintenance checks and services.4-2
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business