TM 5-4320-300-14Table 2-2. Operator/Crew Preventive Maintenance Checks and Services - ContinuedB -Before OperationA -After OperationM - MonthlyD -During OperationW -WeeklyINTERVALITEM TO BE INSPECTEDITEMIS NOT READY/NO. B D A W MPROCEDUREAVAILABLE IFCheck control cable for smooth operation by actuatingstarting aid control knob while engine is stopped.Replace engine side panel.17Speed Regulating Throttle Cable. Remove engine leftside panel. Unfasten hasps and catch assemblies,then pull side panel up and out to remove.2-25
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business